CALLISTA (refit)2021

The 42-metre Callista was hauled out in November 2020 for a refit of all guest areas, completed and delivered in July 2021. Guest-area furniture was repaired and refinished; the master cabin, all ceilings and the captain's cabin were rebuilt; the light oak scheme was replaced with a darker palette; and all flooring, curtains and carpets were renewed.

Length

42 m

Cabins

xx

Design

Shipyard

Aykın

Refit Scope

Septemar's refit covered all guest areas: the master cabin, all ceilings and the captain's cabin were rebuilt, and the lighter oak scheme gave way to a darker palette. Work was carried out at Aykın and completed in July 2021.